New Hampshire Septic & Well Water Rules
The NH Department of Environmental Services (NHDES) Subsurface Systems Bureau approves septic system designs and inspects new systems.
This is a short state page. It covers only the facts we've verified from official sources so far.
Official lookups
Septic approvals
- Under Env-Wq 1000, no one may build a structure that discharges wastewater, or build a septic system, without NHDES approval of the plans.
- Plans must be prepared and sealed by an NHDES-permitted designer. Systems must be built by a permitted installer, except homeowners installing for their own primary home.
- You need both an Approval for Construction and an Approval for Operation, issued after an NHDES inspection, before using a new system.
- Approval for Construction is also needed before converting a seasonal home to year-round use, increasing the load on an existing system, or certain additions.
Private well testing
- NHDES recommends testing bacteria and nitrate/nitrite every year, and arsenic and other standard contaminants every 3-5 years. Its guidance also includes PFAS.
Advertisement
Frequently asked questions
Who can design a septic system in New Hampshire?
Only an NHDES-permitted septic designer. Plans must carry the designer's seal.
Sources
- NHDES: Septic Systems
- NHDES: Septic Designer and Installer
- Env-Wq 1000 rules
- NHDES: Water Testing Guidance for Private Well Users
Last checked: October 21, 2026
Advertisement