Vermont Septic & Well Water Rules
Vermont DEC's Drinking Water and Groundwater Protection Division issues Wastewater System and Potable Water Supply permits, which cover septic systems and wells together.
This is a short state page. It covers only the facts we've verified from official sources so far.
Permits & designers
- A Wastewater System and Potable Water Supply permit is required for new, modified or replaced systems and for other situations listed in the rules.
- A licensed designer must design the system. Classes A, B and BW are limited to 1,350 gallons per day, and Class 1 designers (Vermont professional engineers) can design any size.
- Designer licenses are issued by the Secretary of State's Office of Professional Regulation (OPR). You can check a designer's status with OPR's "Find a Professional" search.
- Septic system installers are not currently licensed by the State of Vermont.
Private well testing
- The Vermont Department of Health sells test kits, including a Homeowner Testing Package it recommends every five years (bacteria, inorganic chemicals including arsenic, and gross alpha).
Advertisement
Frequently asked questions
Do Vermont septic installers need a license?
No. Vermont DEC notes septic installers are not currently licensed by the state, but designers must be licensed.
Sources
- Vermont DEC: WW Permit FAQ
- Vermont DEC: Licensed Designers
- 10 V.S.A. § 1975
- Vermont Dept. of Health: How to Test Your Drinking Water
Last checked: October 21, 2026
Advertisement